For General Contractors

Protect Your Turnover Date. We’ll Own the FF&E.

FF&E and OS&E arrive late in the job, from dozens of vendors, at the exact moment your docks, hoists, and corridors are busiest. BCI Worldwide takes that scope off your plate, with one point of accountability from the first delivery to the final punch list.

2,000+
Projects delivered
1.5M
Rooms installed worldwide
7,000
Rooms in a single project (CityCenter)
100%
Punch list pass rate
Trusted on projects for
MGMWynn ResortsSandsMarriott InternationalPENN EntertainmentHard RockMarina Bay SandsGalaxy MacauHiltonFour Seasons
Why GCs Bring BCI In

The Last Scope In Shouldn’t Be the One That Moves Your Date

FF&E is often owner-purchased, vendor-shipped, and outside your direct control, yet it lands on your schedule and your site. Here is what we take responsibility for, so your superintendent can stay focused on the building.

Dock and Hoist Congestion

Unscheduled trucks from dozens of manufacturers compete with your trades for dock time, hoist slots, and laydown space.

BCI’s answerEverything ships to BCI first. We consolidate it and release it in scheduled loads that fit the dock and hoist windows you assign.

Damaged, Short, or Missing FF&E

A short shipment discovered during install week becomes a reorder, a hole in the room, and a punch item that will not close.

BCI’s answerEvery shipment is inspected on arrival. Damage, shortages, and discrepancies are documented immediately and worked with the manufacturer, purchasing agent, and project team.

Owner-Furnished Items Nobody Owns

OFCI and OFOI packages arrive with no one on site to receive, track, store, or place them, and the GC inherits the problem.

BCI’s answerWe act as the owner’s receiving and installation team on site, with one inventory for every purchase order, so nothing falls between contracts.

Staggered Vendor Deliveries

Hospitality projects rarely arrive all at once. Casegoods, seating, lighting, art, and mirrors trickle in on different timelines.

BCI’s answerWe track each purchase order, hold product until it is needed, and stage it by floor, building, or phase so it arrives complete.

Punch Lists That Drag

Loose FF&E punch items linger after your scope is done and keep the final walk, and your retainage, open.

BCI’s answerOur crews inspect every item against spec, make repairs and adjustments before sign-off, and track each punch item to closure.

Fixed Turnover and Opening Dates

Opening days, brand inspections, and grand openings do not move. The FF&E has to be complete, clean, and guest-ready on time.

BCI’s answerA dedicated BCI project manager plans backward from your turnover date and reports progress against it, room by room.

How We Work With Your Team

Built Into Your Schedule, From Precon to Turnover

BCI plugs into your look-ahead schedule, your site logistics plan, and your owner meetings. You get one coordinated team for vendors, freight, inventory, installation, and closeout.

01

Preconstruction Coordination

Site survey, scope review, and a logistics plan aligned to your schedule, hoist plan, and turnover sequence.

Precon
02

Receiving & Inspection

Every shipment is unloaded, verified against packing lists, and checked for damage before it enters inventory.

Procurement
03

Warehousing & Staging

Product is stored securely and organized by floor, building, room type, or phase until your areas are ready.

Construction
04

Phased Just-in-Time Delivery

Sequenced loads are released into your dock and hoist windows, so floors receive only what they can take.

Construction
05

Installation

Placement to the floor plan, wall-hung items, fixtures, and equipment, installed to project specifications.

Fit-out
06

Punch List & Turnover

Item-by-item quality review, repairs, and adjustments, followed by final sign-off and handover.

Closeout
07

Removal & Liquidation

On renovations, existing FF&E is inventoried, removed, and liquidated, donated, recycled, or disposed of.

Renovation

What your project team receives

  • A single BCI project manager as your point of contact
  • Regular status reporting and real-time updates
  • Delivery schedules tied to your look-ahead

What your superintendent stops managing

  • Dozens of vendor delivery calls
  • Unplanned trucks at the gate
  • Product stored in finished space

What the owner sees

  • Visibility on every purchase order
  • Documented damage and shortage resolution
  • Rooms turned over complete and on schedule
Clear Scope Lines

Who Does What, Before Anyone Asks

A typical division of FF&E responsibilities on a BCI project. We confirm it with you, the owner, and the purchasing agent during preconstruction, so nothing is left for the last month of the job.

ActivityGeneral ContractorBCI WorldwideOwner / Purchasing Agent
Purchase FF&E and OS&E; share POs and ship datesCoordinatesLeads
Assign dock, hoist, and laydown windowsLeadsSchedules into
Receive, inspect, and document every shipmentLeadsInformed
Resolve damage, shortages, and discrepanciesInformedLeadsApproves
Warehouse, stage, and release by floor or phaseLeads
Room readiness (finishes complete, areas released)LeadsConfirms
Install FF&E, wall-hung items, and fixturesLeads
Punch list, repairs, and FF&E sign-offParticipatesLeadsApproves
Remove and liquidate existing FF&E (renovations)CoordinatesLeadsApproves

Illustrative only. Final responsibilities are set by contract.

BLMP, BCI’s Proprietary Platform

Know Where Every Piece Is, Without Making a Call

BLMP is the logistics platform BCI built to track FF&E in real time. Your project team sees the same status our project managers see, from purchase order to placement.

Every shipment

Tracked against its purchase order from arrival through release.

Every warehouse movement

Inventory catalogued and visible while it waits for your floors.

Every installation milestone

Progress reported against the schedule, so nothing surprises the OAC meeting.

Every punch item

Logged, assigned, and tracked to closure before final sign-off.

Proven at Scale

When the Job Is Measured in Thousands of Rooms

BCI has delivered some of the largest single hospitality installations on record, on schedules set by grand openings and gaming licenses.

Las Vegas, NV
7,000rooms

CityCenter

Cited by BCI as the largest one-time hospitality installation ever.

Single-project installation
Macau, China
6,000rooms

Sands Cotai Central

The largest one-time hospitality installation in Asia, and the project that brought BCI to Macau in 2010.

Single-project installation
Hollywood, FL

Seminole Hard Rock Guitar Hotel

A 450-foot landmark tower with more than 600 guest rooms and suites.

WarehousingDeliveryInstallationFF&E & OS&E
Cotai, Macau

The Londoner

Integrated resort project for Sands China on the Cotai Strip.

WarehousingDeliveryInstallation
Cotai, Macau

Wynn Palace

Portfolio work at Wynn Palace and its signature restaurants, including Mizumi and Andrea’s.

Hotels & resortsRestaurants
Ras Al Khaimah, UAE
1stcasino resort in the UAE

Wynn Al Marjan Island

BCI was selected as the FF&E logistics partner for the first casino resort in the UAE, with full in-country warehousing, receiving, inventory management, and installation.

ReceivingWarehousingInventoryInstallation
Charleston, SC

The Cooper

A full FF&E installation for a waterfront hotel, proof that BCI brings the same rigor to boutique projects.

Full FF&E installation
45+
Years in business
$2B
FF&E managed
250+
Las Vegas projects
21,000+
Rooms installed in Singapore
World-Class Partners, Exceptional Results
“…The furniture looks great, and I’m extremely grateful for your team’s efforts to go above and beyond and deliver a great product. Looking forward to wrapping up the last few items here and continuing to work with BCI.”
Director of Design and ConstructionGaming Industry
Hotel lobby furnished and installed
Renovated hotel guest room
Single chair in an empty room awaiting removal
Renovations, PIPs, and Occupied Hotels

Keep Rooms Out of Order for as Few Nights as Possible

On a property improvement plan or a phased renovation, the hotel stays open around you. BCI coordinates the out-with-the-old and in-with-the-new as one sequence, tied to your renovation timeline.

01

Asset inventory

Existing FF&E is evaluated, documented, and categorized before anything moves.

02

Room-by-room deinstallation

Organized removal with minimal disruption to guests, staff, and your trades.

03

Liquidation, donation, and recycling

Recoverable value is captured, and the rest is donated, recycled, or responsibly disposed of.

04

New FF&E, floor by floor

Staged product is delivered and installed as each block of rooms is released back to us.

Global Reach, Local Crews

Wherever You Build, We’re Already There

BCI operates its own offices across North America, Asia-Pacific, and the Middle East. In the U.S., our sister company, BMS Moving & Storage, adds a warehouse and delivery network under the same family ownership.

17

U.S. locations operated by BMS Moving & Storage, our sister company. Together, BMS and BCI operate 24 locations worldwide, and both are members of the Office Moving Alliance.

Lakewood Ranch, FLHeadquarters
Since 2019
Las Vegas, NVWhere BCI began
Since 1980
Orlando, FLCentral Florida
Since 2025
MacauGreater China
Since 2010
Hong KongAsia-Pacific
Since 2024
SingaporeSoutheast Asia
Since 2014
PhilippinesSoutheast Asia
Since 2026
BangkokThailand
Since 2026
Dubai, UAEMiddle East
Since 2025
GC Questions, Answered

What General Contractors Ask Us First

Don’t see your question? Your BCI project lead will walk through it on a preconstruction call.

When should we bring BCI into the project?

As early as preconstruction. Bringing us in before FF&E purchase orders ship lets us build receiving, warehousing, and delivery around your site logistics plan, hoist schedule, and turnover sequence, rather than reacting to trucks at the gate.

Who do you contract with: the GC, the owner, or the purchasing agent?

We work closely with owners, purchasing agents, designers, contractors, and manufacturers on every project.

Can you receive owner-furnished items on our behalf?

Yes. Owner-furnished FF&E and OS&E can ship directly to a BCI facility, where it is received, inspected, inventoried, and stored until the space is ready, then delivered and installed by our team.

What happens when product arrives damaged or incomplete?

Every shipment is inspected on arrival. Damage, shortages, or discrepancies are documented immediately and communicated to the right stakeholders, and we work with the manufacturer, purchasing agent, and project team to resolve them while protecting the installation schedule.

How do you handle multiple manufacturers and staggered deliveries?

We track each purchase order, receive and inspect every delivery, and store materials until they’re needed on site. Installations are staged by floor, building, or phase, which reduces congestion and keeps construction moving.

Will we have visibility into status without chasing your team?

Yes. BLMP, our proprietary logistics platform, tracks every shipment, warehouse movement, installation milestone, and punch list item, and your BCI project manager provides proactive updates throughout.

Do you handle renovations in operating hotels and casinos?

Yes. We manage asset inventories, room-by-room removal, liquidation, donation, recycling, and disposal, followed by delivery and installation of new FF&E, all sequenced to the renovation timeline. We also work on gaming floors and in other high-security environments.

What size projects do you take on, and where?

From boutique hotel renovations to developments with thousands of guest rooms, public spaces, restaurants, gaming areas, and amenities. We work across the United States, Asia-Pacific, and the Middle East, and also support restaurants, senior living, healthcare, and higher education projects.

Can you provide our prequalification documents?

Yes. Our GC capabilities packet includes safety, insurance, and company information for your risk review.

Start the Conversation

Put BCI on Your Next Hospitality Bid

Request our GC capabilities packet, or schedule a preconstruction call with our team. Tell us about the project, and we’ll respond within one business day.

This field is for validation purposes and should be left unchanged.
Contact info
Project details
MM slash DD slash YYYY
Additional information

Your information is never shared with third parties. View our Privacy Policy.